Work required to change over a machine or process from one item or operation to the next item or operation. For Seeing and Eliminating Waste.

 

Set-up Time Types

1. Internal: set-up work that can be done only when the machine is not actively engaged in production OR

2. External: set-up work that can be done concurrently with the machine or process performing production duties.

 

 

 

Courses that cover Set-Up Times


Lean Practitioner
For those wanting to complete a full, accredited course in Lean.

  • 8 week course that is accredited by Cardiff University
  • Includes RIE and practical
  • Online recorded
  • Live tutorials


Cardiff university

certification

Newsletter down arrow

Click the button below to sign up to our newsletter.
Take the Survey

Who we help    V

Lean Training


Set-up Time | Lean Dictionary | Simpler Training